The Renewable Energy Section of Campaign Masters has undertaken three projects of Solar installation in Nasik District of Maharashtra. These are Civil and Electrical contracts awarded to Campaign Masters by Avaada Clean Project Pvt Ltd.
Site 1 : Bhokani 5MW
Site 2 : Ambe Dindori 3 MW
Site 3 : Mohadi 4 MW
The Civil work includes
- Survey
- Grading
- Fencing work – Marking, Drilling, Casting, Capping, Angle Casting in Meter, Chain link in Meter, ReDrilling, Barbed wire fitting, Tension wire fitting.
- Pilling work – Marking, Drilling, Casting, Capping & Alignment
- ICR FOUNDATION WORK – ACCB – Excavation, PCC work, Footing, Column, Beam, Slab.
- AC KIOSK- Excavation, PCC, Footing, Column.
- IDT – Excavation, PCC, Raft, Wall, Grade slab PCC, Grade slab, Brick work, Fencing.
- Aux Trafo Excavation, PCC, Brick work, Pedestal.
- Switchgear
- Excavation, PCC, Brick work, Plaster, Grade slab.
- Inverter Stand MMS and Module Erection.
- ACCB Shed work
- Rafter Erection
(25 Leg) Tables
(19 Leg) Tables
(13 Leg) Tables
(07 Leg) Tables - Purlin Erection
- Module Erection
Electrical work (AC BOS)
- Trenching for earthing & cable laying
- Table to table ICR Earthing work
- Field earthing work
- LA Installation
- Stool fabrication and cable tray work
- Riser work
- Trench strip Welding work
- Cable tray stool casting
- Inverter cable laying
- Inverter stand canopy
- Concrete blocks for cable laying
- Fly ash laying and trench Backfilling
- IDT gread earthing backfilling
- Backfilling with PLB Duct laying and Caution tape
- Grid earthing and welding work
- Installation of Rafters
- Control cable laying
- Erection, testing & commissioning of
- SCADA Panel
- Installation of weather monitoring station.
- ETC of ACDB
- Installation of RTCC Panel
Electrical work (DC BOS)
- Interconnection of Modules to prepare a String as per Drawing and standard practice
- Laying and fixing of 32 MM DIA PLB-HDPE duct in B/w structure for +ve and #ve cables
- Laying and termination of DC CU cable for interconnections between module inside cable tray
- Termination, cross ferruling, dressing, crimping of solar cable
- Laying of NP3 class ring type Hume pipes for cable protection at road crossing
- Installation of string monitoring units
- Laying & Termination of GI strip for table/structure & SCB earthing to main grid
- Termination of 70 sq mm Cu wire for earthing of string inverter to the nearest main earth grid point
- Installation of cable route marker with cable pulling pits for maintenance
- Installation of danger plates
- Cable tags installation at SMU O/P and inverter I/P
- Cable ties for cable from strings to SMU
- ETC of ladder tray 750MM
- Installation of earth electrodes
- SCB and structure painting
- Excavation of soil for side slopes below ground level
- Supply and laying of bricks
- DC commissioning test